Overall summary reports

Top  Previous  Next

A summary report based on the LPI or vertical settlements or lateral displacements, for all selected (checked) CPTU file can be generated from the menu Reports and Overall summary report command. The following dialog will appear:

Overall summary report selection dialog

Overall summary report selection dialog

According to the selection made in the dialog shown above, CLiq will create a report (below is a report based on the LPI results)

Overall LPI report

Overall LPI report